CDA Launches Solarization Project to Cut Monthly Electricity Costs by Rs. 250 Million

June 7, 2024Zayn0

The Capital Development Authority (CDA) has declared a major effort to switch to solar power for its buildings, street lighting, tube wells, and water pumps to lower expensive electricity bills.

CDA’s Solarization Project

This choice is a component of the CDA’s larger initiative to support cost-effectiveness and sustainability. The solarization project’s feasibility study has received approval from the CDA Board. This action is expected to save the agency Rs. 250 million per month, according to CDA sources.

Stages of project

The project will be carried out in three stages: street lighting will come first, then CDA buildings will be converted, and tube wells and water pumps will be powered by solar energy.

Capacity and Cost Savings

To produce 4.5 megawatts of power, the initiative intends to put solar panels on tube wells and waterworks throughout the capital. It is anticipated that this solar system will operate the tube wells and waterworks for the next 25 years, paying for the Rs. 80 million installation cost in the first four years.

Feasibility Study and Planning

The CDA Board was given a synopsis of the solarization project by member engineer Khalid Hafeez. Following careful consideration of all the views, the board stressed that a full feasibility study was needed. To guarantee the best results, this research will review site characteristics, intricate system design, technical and financial evaluations, regulatory compliance, integration with current infrastructure, and protocols for monitoring and maintenance.

Ensuring Compliance and Smooth Transition

In compliance with the 2004 regulations set forth by the Public Procurement Regulatory Authority (PPRA), the board has chosen to carry out this feasibility study. The study will complete the installation plans for solar photovoltaic (PV) electricity, guaranteeing that all legal and technical requirements are satisfied for a smooth switch to solar energy.

In Summary

The large-scale solarization project of the CDA is a big step toward affordable and sustainable energy management in the capital. The authority hopes to lower its electricity costs and help Pakistan achieve its renewable energy targets by utilizing solar power. The project’s success will be guaranteed by the comprehensive planning and feasibility assessment, which will also serve as a model for other government agencies considering solar solutions.

 

Zayn

Leave a Reply

Your email address will not be published. Required fields are marked *

Prove your humanity: 0   +   7   =  

Search & have fun

Search anytime for whatever you need, for your business, fun or personal needs. LCCI helps you find it easy and fast.

Search & have fun

Search anytime for whatever you need, for your business, fun, or personal needs. LCCI helps you find it easy and fast.

Explore

Users

LCCI

Copyright © 2025 LCCI  All Rights Reserved.
Developed by TARGET MARKETING (PVT) LIMITED

Copyright © 2025 LCCI  All Rights Reserved.
Developed by TARGET MARKETING (PVT) LIMITED.